Bathroom Remodeling
Private rooms designed for daily ritual.
Primary suites, guest baths, and powder rooms — layout, showers, vanities, and quiet material choices planned around how you start and end the day.
Free 15-minute call · No obligation
See your space in 3D before anything is demolished.
Why Estate Renovations
The promises that come before the finishes.
01
Guaranteed price
Selections and scope are settled first. The construction agreement then names the price for that work.
Terms and conditions02
3D before demolition
See layout, tile, and light in full before a wall comes down.
03
Daily communication
During construction, your project lead writes each day — progress, photos, and anything waiting on you.
04
Ten-year warranty
A written workmanship warranty stays with the home for ten years after the project is complete.
See terms and conditions
Free 15-minute call · No obligation
The path
Design. Renovate. Enjoy.
01
Design
Layout, waterproofing plan, materials, and 3D — approved before renovation begins.
02
Renovate
Construction under a clear scope, with progress you can follow.
03
Enjoy
A bath that calms the day — built for steam, routine, and the next decade.
Step one · A free 15-minute call

From layout to plan
A bathroom should calm the day — not complicate it.
Layout, waterproofing, and storage decide whether a bath feels generous or cramped — long before tile choices. We resolve the plan first, then refine materials in studio light.
01
Resolve the layout
Footprints reworked so the room fits how you start and end the day — before tile choices.
02
Waterproof the assemblies
Showers, floors, and wet walls detailed for decades of steam and routine.
03
See it in 3D
Approve materials, lighting, and atmosphere on screen before demolition begins.
Free 15-minute call · No obligation
Recent bathrooms
Quiet, lasting rooms.
Ready to plan a bath that feels like a retreat?
A short conversation is enough to clarify scope, sequence, and whether Estate Renovations is the right fit.
Free 15-minute call · No obligation
During design
What you’ll decide before we build.
Guided selections in studio light — so construction executes a plan, not a series of guesses.
Free 15-minute call · No obligation
- 01Layout and plumbing locations
- 02Shower: curbless, oversized, or steam
- 03Vanity millwork and storage
- 04Tile and stone for continuity
- 05Layered lighting that flatters
- 06Fixtures, hardware, and paint
Featured bathrooms
Step inside a finished project.

Bathroom
Versailles, KY
A primary bath in black, marble, and brass
Double vanity, glass shower, and a freestanding tub against marble tile — a spa-like primary suite finish.

Bathroom
Lexington, KY
Twin vanities in marble and pale blue
A floating wood vanity, veined stone, and brass fixtures — quiet luxury for a primary bath.
Bathroom FAQs
A few common questions.
Ask us anything on a free 15-minute call
- Do you handle plumbing relocations?
- Yes — moving plumbing is often essential to a better layout, and our design-build team coordinates it as part of the project.
- Can a small primary bathroom feel spa-like?
- Yes. Material continuity, considered lighting, and storage decisions matter far more than square footage.
- Do you do guest baths and powder rooms?
- Yes — smaller bathrooms benefit just as much from thoughtful design, and we approach them with the same care.
- How disruptive is a bathroom remodel?
- We plan sequencing, protection, and temporary facilities so the rest of the house stays livable. Exact timelines depend on scope and whether plumbing moves.
Start a Conversation
Ready to plan a bath that feels like a retreat?
Tell us about the bathroom you're considering — or call. We'll outline the right first step.
Free 15-minute call · No obligation
